Colombian regasification terminal operates at full capability

[ad_1]





















Printed by Jessica Casey,
Editor




LNG Business,






SPEC’s LNG regasification terminal in Colombia has reached historic working ranges to reply to the rise in demand for gas-fired thermal era throughout the present interval of low hydrology.

“The regasified LNG in SPEC LNG throughout probably the most vital dry interval of El Niño has supported greater than 70% of the nation’s gas-fired thermal era and has represented greater than 30% of the nationwide fuel demand, contributing to the reliability of electrical vitality for Colombia,” reported José María Castro, Normal Supervisor of SPEC LNG, inside the framework of Arpel Naturgas Week 2024.

In response to SPEC LNG figures, the regasification terminal, positioned in Cartagena, reached working information in March 2024, receiving 9 LNG tankers with almost 500 000 m3 of LNG throughout the month, and delivering 400 million ft3/d of pure fuel.

“We’re working at 100% of our present capability to help {the electrical} vitality era system on this state of affairs through which the bottom reservoir ranges within the final 20 years in Colombia are recorded,” Castro defined.

Learn the article on-line at: https://www.lngindustry.com/regasification/12042024/colombian-regasification-terminal-operates-at-full-capacity/


 








[ad_2]

Source_link