[ad_1]
Revealed by Jessica Casey,
Editor
LNG Business,
OLT Offshore LNG Toscana has introduced that the FSRU Toscana terminal will bear a rare upkeep on the shipyard, leading to a shutdown of the plant, scheduled from the start of April to the top of October 2024.
Particularly, because of ongoing technical monitoring actions, the corporate determined to hold out an intervention geared toward changing the bearing of the anchoring system of the terminal, a system designed and constructed to make sure the rotation of the terminal across the geostationary turret completely anchored to the seabed.
Procedures are presently underway to schedule the suspension of operations and proceed with the bearing substitute work.
OLT has arrange an applicable management and monitoring system for the anchoring system, whereby it states that, at current, situations enable the complete operation of the terminal with none security and environmental affect.
Learn the article on-line at: https://www.lngindustry.com/floating-lng/01022024/olt-to-carry-out-maintenance-on-fsru-toscana/
[ad_2]
Source_link