Ingo Emde, R. Stahl, Germany, analyses how security on ships and on shore may be prioritised when dealing with LNG.
Loading and unloading tankers requires the utmost care. Product loss will not be tolerated; measuring options have to be dependable and appropriate for custody switch functions. Preparations for the operation are undertaken on board the ship and on the terminal, lengthy earlier than the ship docks. There are lots of guidelines that have to be noticed on the subject of loading and unloading. Ancillary processes resembling balancing the ballast tanks have to be efficiently applied alongside this operation. The primary rule is security first, particularly when coping with cryogenic substances like LNG.
Speaking with each other is essential. That is actually the case when a completely laden LNG tanker is approaching the terminal. The ship’s crew should contact the operations staff on the terminal nicely upfront of their arrival. There are lots of particulars to debate earlier than the tanker docks on the jetty and unloading commences. One of many key particulars is the estimated time of arrival, which have to be disclosed in good time (e.g. 72 hours previous to arrival) and repeatedly up to date. This tells the staff on the receiving terminal when they should begin getting ready the tanks which might be to be crammed, be they on shore or on an FSRU.
Discussing unloading procedures
It goes with out saying that earlier than LNG tankers may be unloaded, the personnel on the plant terminal want the cargo paperwork. The pre-operational ship/shore procedures then have to be mentioned, and the protection checklists have to be accomplished. LNG contains round 95% methane. If it mixes with oxygen and the oxygen focus exceeds a sure stage, this may represent an explosive combination. To counter this threat and the dangers related to the LNG temperature of -163°C, sure precautions have to be taken with the intention to assure most security throughout loading and unloading operations.
Earlier than loading and unloading operations can happen, the tanks that can be crammed with the cryogenic LNG have to be ready. They have to be dropped at a sufficiently low temperature to stop extreme portions of LNG from violently vaporising when launched into the tanks. Moreover, the quantity of residual oxygen within the tanks have to be minimal.
Inerting and pre-cooling storage tanks and loading equipment is crucial
Hours earlier than the provision ship arrives, the staff on the unloading terminal should begin pre-cooling and inerting the onshore tanks utilizing dry nitrogen. As soon as the quantity of oxygen within the tank drops beneath 2% and the temperature is round -45°C, some LNG that’s saved in reserve is launched into the tank. This vaporises, additional cooling the within of the tank to round -130°C.
Likewise, the loading arms and manifold pipes are purged a number of instances with nitrogen till the oxygen content material of the purge gasoline that has been repeatedly discharged is lower than 2%. This ensures that explosive methane-oxygen mixtures can’t type through the unloading operation.
Skilful management of the loading arms
As soon as these preparations are full, the tanker can dock. As with every massive tanker, the LNG provider should all the time be securely moored and anchored (or moored to the FSRU, if the terminal is a floating one) earlier than it’s unloaded. The following step is without doubt one of the most important: the terminal or terminal ship have to be linked to the tanker loading system by the use of loading arms, pipes, and hoses. That is no simple process. It takes a certain quantity of talent to information the pipes on board utilizing the remote-controlled loading arms after which line them up on the appropriate angle.
The flanged joints should then be correctly sealed and secured. To remove the potential for human error, at the least two staff are assigned to this. Electrohydraulic LNG loading arms use game-changing, purpose-built expertise that frequently compensates for the ship’s actions as a result of motion of the waves. The place they’re put in on an FSRU, they’ll even compensate for the motion of the waves between the 2 ships. In an emergency, the loading arm will robotically disconnect from the ship; ideally, it will occur with out a lot LNG escaping. The usage of an emergency launch coupling makes this potential. If, nonetheless, massive portions of LNG do escape because of an working error, the hydraulic system prevents the plant from being broken, whereas the explosion-protected electrical system prevents an explosion.
Cautious cooling prevents vapour locks
Earlier than the unloading course of can start, the cargo pipelines and loading arms should even be cooled. This largely prevents deformation because the cargo passes via at -163°C. If the pipelines are comparatively heat when the LNG is launched, the resultant fast vaporisation of the pure gasoline could cause vapour locks to type, which may block the trail of any LNG that flows alongside the road subsequently. This may increasingly in flip end in harm to pipelines, valves, and flanges. One of many issues used for cooling is definitely LNG, which is sprayed into the arms both from the ship or from the onshore terminal.
Loved what you’ve got learn to this point? Learn the complete article and the remainder of the December problem of LNG Business by registering right now at no cost!
Learn the article on-line at: https://www.lngindustry.com/special-reports/09012024/handling-lng/
Embed article hyperlink: (copy the HTML code beneath):
[ad_2]