[ad_1]
Printed by Jessica Casey,
Editor
LNG Business,
As of 1 January 2024, RWE has handed over the LNG infrastructure in-built Brunsbüttel to the federally-owned Deutsche Vitality Terminal GmbH (DET) as deliberate, round 10 months after the primary LNG import circulation. Liquefied gasoline delivered by LNG tankers is fed into the German gasoline grid after being regasified through an FSRU. DET is the authorised operator of the FSRU terminal in Brunsbüttel and can also be chargeable for its capability advertising and marketing.
RWE chartered the Hoegh Gannet floating LNG terminal on behalf of the German authorities after the beginning of the Russia-Ukraine battle in February 2022 and constructed the corresponding infrastructure in Brunsbüttel to strengthen Germany’s safety of provide and cut back its dependence on Russian pipeline gasoline. The Elbehafen undertaking was realised in report time and put into operation by RWE throughout 2023. Because the starting of 2023, LNG has been imported on to Germany through Brunsbüttel.
As all the time supposed, DET has now taken over the LNG infrastructure and sole operational administration in Brunsbüttel.
Learn the article on-line at: https://www.lngindustry.com/floating-lng/02012024/rwe-hands-over-brunsbttel-lng-infrastructure-to-deutsche-energy-terminal/
[ad_2]
Source_link