[ad_1]
Printed by Jessica Casey,
Editor
LNG Business,
GTT has acquired an order from a Chinese language shipyard for the tank design of eight new very massive LNG carriers.
GTT will design the tanks for these eight LNG carriers, which is able to every provide 5 tanks with a complete capability of 271 000 m3. The tanks shall be fitted with the NO96 Tremendous+ membrane containment system developed by GTT.
Supply is scheduled between 2Q28 and 4Q29.
Learn the article on-line at: https://www.lngindustry.com/lng-shipping/14022024/gtt-receives-tank-design-order/
[ad_2]
Source_link